New Center for Biomedical Research

Medical University Wien, ALG Himberg

Client

Bundesimmobiliengesellschaft m.b.H.
Trabrennstraße 2 c
A-1020 Wien

Usage

laboratories, office area, seminar room, workshop, warehouse

Work phases

2 – 7 general planning

Safety levels

S1, S2

Planning start

2018

Construction time

2020- 2022

GFA

5.088 m²

GC

23.855 m³

UA 1-7

1.932 m²

At the Himberg site in Lower Austria, a large part of the buildings of the Medical University of Vienna are showing their age and are to be rebuilt according to modern standards and used together with other Austrian universities and research institutions. Characterized by efficient functions and processes as well as a compact structure, the design provides for two parts of the building that are connected to one another via a generously glazed entrance area.

The appearance of both new buildings is based on the rural surroundings and is characterized by a uniform shell made of carbonized wooden slats, which clad the closed areas in front of the massive parapets and wall surfaces and visually tie the buildings together. The industrial charring of the outer layer of wood preserves the material by creating a natural protection against fungi and vermin. With this technique, chemical wood preservatives, paint coatings or stains and their regular renewal can be dispensed with. At the same time, a very economical and sustainable facade material is used in an appropriate environment.

Your Project? Get in touch with us.

We're very looking forward to your request.

Get in touch